Excavation, swell, reuse, truckloads and haul cost

Trench Spoil Volume Calculator

Estimate bank excavation, loose spoil volume, reusable material, hauled volume, full truckloads and disposal cost for a rectangular trench.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

27.78 yd³

Bank excavation

22.22 yd³

Reused on site

8.33 yd³

Volume to haul

19.44 yd³

Truckloads

2

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Trench length

Enter this project assumption in ft. The current imperial default is 100 ft.

Average trench width

Enter this project assumption in ft. The current imperial default is 2 ft.

Average trench depth

Enter this project assumption in ft. The current imperial default is 3 ft.

Excavated swell

Enter this project assumption in %. The current imperial default is 25 %. Minimum: 0. Maximum: 80.

Loose spoil reused on site

Enter this project assumption in %. The current imperial default is 30 %. Minimum: 0. Maximum: 100.

Truck capacity

Enter this project assumption in yd³. The current imperial default is 10 yd³.

Cost per truckload

Enter this project assumption in a unitless value. The current imperial default is 325. Minimum: 0.

How to read the outputs

Bank excavation

in-place trench volume. Default preview: 22.22 yd³.

Reused on site

30% of loose spoil. Default preview: 8.33 yd³.

Volume to haul

after reuse. Default preview: 19.44 yd³.

Truckloads

rounded full loads. Default preview: 2.

Trench footprint

plan area. Default preview: 200 ft².

Haul cost

entered load rate. Default preview: $650.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Bank volume = length × width × depth. Loose spoil = bank volume × swell factor. Haul volume subtracts the entered reuse percentage, then truckloads are rounded up.

Reviewed project guidance

How to use this estimate in a real project

Last reviewed: August 19, 2026

Convert in-place trench excavation into loose spoil volume using swell, then estimate reusable spoil, hauled volume, truckloads and disposal cost.

Calculation steps

  1. 1Calculate bank excavation from average trench dimensions.
  2. 2Apply material swell after excavation to estimate loose spoil.
  3. 3Subtract only the loose spoil that can genuinely be reused on site.
  4. 4Divide haul volume by usable truck capacity and round to whole loads.

Worked numerical example

A 100 ft × 2 ft × 3 ft trench contains 600 ft³, or about 22.2 yd³ bank volume. With 25% swell, loose spoil is about 27.8 yd³. Reusing 30% leaves about 19.4 yd³ to haul, requiring two 10 yd³ truckloads.

Purchasing and rounding

Disposal pricing may be by truck, ton or volume. Confirm truck legal payload, disposal-site acceptance and whether wet/heavy soil reaches weight limits before nominal volume.

Interpret the result

Bank volume describes the excavation void; loose volume describes excavated material. Truckloads must be based on the loose hauled volume, not trench geometry.

Page-specific assumptions

  • Average trench width/depth represent the run.
  • Swell factor is appropriate for excavated material.
  • Reuse percentage applies to loose spoil.

Common mistakes

  • Applying swell to truck capacity instead of excavated material.
  • Subtracting compacted backfill volume directly from loose spoil.
  • Assuming every truck can carry its nominal volume of wet soil.

Primary and technical references

BuildMeter provides planning estimates, not engineering, architectural, electrical, mechanical, plumbing, permit or code approval. Review the methodology and verify final decisions with product documentation and qualified professionals.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Trench Spoil Volume Calculator questions

Why is loose spoil larger than the trench?+

Excavated soil expands because its in-place structure is disturbed and void space increases.

Can all excavated soil be reused as backfill?+

Not always. Material suitability, compaction requirements and displaced pipe or bedding volume affect reuse.

Does truck capacity equal legal payload?+

Not necessarily. Weight limits and material density may reduce the usable volume per load.