Bank volume, swell, weight and truck loads

Excavation Calculator

Estimate excavation volume, loose hauled volume, soil weight, truck loads, digging cost and hauling cost for a rectangular cut.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

22.22 yd³

Loose volume

27.78 yd³

Estimated weight

30 short tons

Truck loads

3

Excavation cost

$400.00

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Bank volume = length × width × depth. Loose volume = bank volume × swell factor. Weight = bank volume × bank density. Loads = round up (weight ÷ truck payload).

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Excavation Calculator questions

What is excavation swell?+

Soil expands when loosened, so hauled volume is larger than the in-place bank volume.

Should truck loads be based on weight or volume?+

Both limits matter. This estimate uses payload weight; bulky light material may reach body volume first.

Does this include sloped excavation sides?+

No. It assumes a rectangular cut. Safe slopes, benches or shoring can greatly increase volume.