Aggregate base, bedding sand and fabric

Paver Base Calculator

Estimate aggregate-base tonnage, bedding-sand volume, geotextile area and material cost for a rectangular paver project.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

9.17 short tons

Bedding sand

1.02 yd³

Project area

300 ft²

Fabric order

330 ft²

Base volume

6.11 yd³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Layer volume = project area × layer depth × allowance factor. Base tonnage = aggregate-base volume × entered density.

Related tools

Continue planning the project

FAQ

Paver Base Calculator questions

Is bedding sand included in base depth?+

No. The calculator treats compacted aggregate base and bedding sand as separate layers.

Why does vehicle traffic need a deeper base?+

Higher loads require greater support and better control of settlement and frost movement.

Should paver base be compacted in lifts?+

Often yes. Maximum lift thickness depends on material and compaction equipment.