Heat Pump Running Cost Calculator

Estimate heat-pump electrical input, monthly electricity use and running cost from thermal capacity, COP, load factor and operating schedule.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

$91.16

Full-load electrical input

3.52 kW

Average electrical demand

2.11 kW

Daily electricity

16.9 kWh

Monthly electricity

506.4 kWh

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Thermal capacity

Enter this project assumption in BTU/h. The current imperial default is 36000 BTU/h.

Average COP

Enter this project assumption in a unitless value. The current imperial default is 3.

Average load factor

Enter this project assumption in %. The current imperial default is 60 %. Minimum: 1. Maximum: 100.

Operating hours

Enter this project assumption in hours/day. The current imperial default is 8 hours/day. Minimum: 0. Maximum: 24.

Operating days

Enter this project assumption in days/month. The current imperial default is 30 days/month. Minimum: 1. Maximum: 31.

Average backup-heat input

Enter this project assumption in kW. The current imperial default is 0 kW. Minimum: 0.

Electricity price

Enter this project assumption in per kWh. The current imperial default is 0.18 per kWh. Minimum: 0.

Monthly fixed operating cost

Enter this project assumption in a unitless value. The current imperial default is 0. Minimum: 0.

How to read the outputs

Full-load electrical input

at COP 3. Default preview: 3.52 kW.

Average electrical demand

load factor plus backup input. Default preview: 2.11 kW.

Daily electricity

average operating day. Default preview: 16.9 kWh.

Monthly electricity

entered schedule. Default preview: 506.4 kWh.

Thermal capacity

capacity conversion. Default preview: 10.55 kW.

Cost per operating hour

including entered fixed cost. Default preview: $0.38.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Full-load electrical input = thermal capacity ÷ COP. Average demand applies the load factor and adds backup heat. Monthly energy = average kW × operating hours.

Reviewed project guidance

How to use this estimate in a real project

Last reviewed: July 30, 2026

Use the Heat Pump Running Cost Calculator to estimate a planning quantity from verified heat output, COP, runtime and electricity tariff. It supports scope comparison, purchasing and operating-cost planning, but it does not select equipment, approve code compliance or replace project-specific design.

Calculation steps

  1. 1Measure or obtain each design input from the actual project and keep one consistent unit system.
  2. 2Enter heat output, COP, runtime and electricity tariff using product data or approved design information rather than generic nominal values.
  3. 3Review the unrounded engineering or usage result before applying allowances, duty cycle, efficiency or tariff assumptions.
  4. 4Apply each adjustment once, then round only the final purchasing, equipment-count or scheduling output.

Worked numerical example

Providing 18 kWh of heat at COP 3.0 requires about 6 kWh of electricity; at $0.20/kWh the estimated operating cost is $1.20.

Purchasing and rounding

Use COP or seasonal performance appropriate to outdoor temperature and equipment condition. Do not use nameplate heating capacity as electrical input.

Interpret the result

The estimate links delivered heat to electrical use through the entered COP. Defrost, auxiliary heat, cycling and temperature-dependent COP can raise actual consumption.

Page-specific assumptions

  • Inputs describe the actual connected system or measured project scope.
  • One operating condition, product rating and unit system are used per calculation.
  • Allowances and efficiency losses are not already embedded in the entered values.
  • Code, health, structural, electrical and hydraulic requirements are verified independently.

Common mistakes

  • Using nominal equipment ratings instead of delivered performance at design conditions.
  • Mixing instantaneous flow or power with daily or annual energy.
  • Applying the same allowance more than once.
  • Treating a quantity or cost estimate as equipment selection or professional approval.

Primary and technical references

BuildMeter provides planning estimates, not engineering, architectural, electrical, mechanical, plumbing, permit or code approval. Review the methodology and verify final decisions with product documentation and qualified professionals.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Heat Pump Running Cost Calculator questions

Why use a load factor?+

Heat pumps rarely operate at full rated capacity for every scheduled hour.

Should backup resistance heat be included?+

Yes when it operates. Enter its average electrical input during the modelled schedule.

Is COP constant?+

No. COP changes with source and delivery temperatures, cycling and defrost.