Starting watts, kVA, current and fuel cost

Generator Size Calculator

Create a preliminary portable-generator size estimate from continuous load, largest motor starting demand, reserve capacity and operating hours.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

10,000 watts

Peak load before rounding

9,600 W

Apparent power

12.5 kVA

Output current

41.7 A

Motor-start extra

3,000 W

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Peak watts = continuous load + motor running watts × (starting multiplier − 1). Reserve is applied, then capacity is rounded up to the next 500 watts. kVA = kW ÷ power factor.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Generator Size Calculator questions

Why are starting watts higher than running watts?+

Motors and compressors can draw several times their running power during startup.

Can a generator connect directly to house wiring?+

Only through approved transfer equipment installed according to electrical code. Improper backfeeding can kill utility workers and occupants.

Does this replace an electrician load calculation?+

No. It is a preliminary planning estimate and does not account for every load characteristic or installation requirement.