Connected demand, peak watts and current

Electrical Load Calculator

Create a preliminary electrical-load estimate from general loads, fixed heating, motor demand, diversity, startup demand and reserve capacity.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

16.38 kW

Connected load

12.8 kW

Estimated current

75.8 A

Motor-start addition

3.6 kW

Apparent power

18.2 kVA

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Diversified demand = non-motor connected load × demand factor + motor running load. Peak capacity adds motor starting demand and reserve. Current depends on voltage, phases and power factor.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Electrical Load Calculator questions

Is connected load the same as demand load?+

No. Connected load totals nameplate loads, while demand estimates which loads are likely to operate together under applicable rules.

Why include motor starting demand?+

Motors and compressors can draw substantially more power during startup than while running.

Can this size a breaker or electrical service?+

No. Electrical sizing must follow applicable code and equipment data under a qualified designer or electrician.