Screed volume, bag quantity, purchased yield and cost

Floor Screed Calculator

Estimate floor-screed volume and bag quantity from room dimensions, screed thickness, waste allowance and editable product yield.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

83 bags

Floor area

300 ft²

Base volume

37.5 ft³

Order volume

41.25 ft³

Purchased yield

41.5 ft³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Floor length

Enter this project assumption in ft. The current imperial default is 20 ft.

Floor width

Enter this project assumption in ft. The current imperial default is 15 ft.

Average screed thickness

Enter this project assumption in in. The current imperial default is 1.5 in.

Waste and level allowance

Enter this project assumption in %. The current imperial default is 10 %. Minimum: 0. Maximum: 40.

Mixed yield per bag

Enter this project assumption in ft³. The current imperial default is 0.5 ft³.

Price per bag

Enter this project assumption in per bag. The current imperial default is 12 per bag. Minimum: 0.

How to read the outputs

Floor area

length × width. Default preview: 300 ft².

Base volume

before waste and leveling. Default preview: 37.5 ft³.

Order volume

10% allowance. Default preview: 41.25 ft³.

Purchased yield

rounded bag quantity. Default preview: 41.5 ft³.

Unused yield

after bag rounding. Default preview: 0.25 ft³.

Material allowance

bags × entered price. Default preview: $996.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Base volume = floor length × floor width × average thickness. Waste is added, then bags = round up (order volume ÷ mixed yield per bag).

Related tools

Continue planning the project

FAQ

Floor Screed Calculator questions

Is floor screed the same as self-leveling compound?+

No. Screed is generally installed thicker and uses a different mix and placement method than many self-leveling products.

Why use average thickness?+

Existing floors are often uneven. The average placed thickness gives a better volume estimate than the minimum depth alone.

Where can I find bag yield?+

Use the mixed-volume yield stated by the manufacturer for the exact product and water ratio.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

About the author