Storage demand, roof harvest and cost

Cistern Size Calculator

Estimate cistern storage from daily demand and dry-period duration, then compare roof catchment from a design rainfall event and estimate tank cost.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

2,415 gal

Base storage demand

2,100 gal

Event roof harvest

954 gal

Cistern fill equivalent

39.5%

Harvested days of supply

6.4 days

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Roof catchment area

Enter this project assumption in ft². The current imperial default is 1800 ft².

Design rainfall event

Enter this project assumption in in. The current imperial default is 1 in.

Runoff coefficient

Enter this project assumption in a unitless value. The current imperial default is 0.85. Minimum: 0.1. Maximum: 1.

Daily cistern demand

Enter this project assumption in gal/day. The current imperial default is 150 gal/day.

Design dry period

Enter this project assumption in days. The current imperial default is 14 days.

Storage reserve

Enter this project assumption in %. The current imperial default is 15 %. Minimum: 0. Maximum: 50.

Tank price

Enter this project assumption in per 1,000 gal. The current imperial default is 950 per 1,000 gal. Minimum: 0.

How to read the outputs

Base storage demand

before reserve. Default preview: 2,100 gal.

Event roof harvest

1 in rainfall. Default preview: 954 gal.

Cistern fill equivalent

one design event. Default preview: 39.5%.

Harvested days of supply

at entered demand. Default preview: 6.4 days.

Runoff loss

entered coefficient. Default preview: 15%.

Tank cost allowance

storage vessel only. Default preview: $2,294.25.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Storage demand = daily demand × dry days × reserve factor. Roof harvest equals catchment area × rainfall depth × runoff coefficient, converted to gallons or litres.

FAQ

Cistern Size Calculator questions

Why can one storm harvest less than the required storage?+

Storage sizing is based on demand through a dry period, while one rainfall event may refill only part of the tank.

What does the runoff coefficient represent?+

It accounts for splash, evaporation, first flush and other losses between rainfall and collected water.

Can collected rainwater be used for drinking?+

Only with an approved treatment, monitoring and plumbing system that meets applicable requirements.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.