15 fixtures

Required lumens

75,000

Installed illuminance

75 fc

Connected lighting load

0.68 kW

Monthly electricity

118.8 kWh

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Workshop floor area

Enter this project assumption in ft². The current imperial default is 600 ft².

Target illuminance

Enter this project assumption in foot-candles. The current imperial default is 75 foot-candles.

Utilization factor

Enter this project assumption in a unitless value. The current imperial default is 0.75. Minimum: 0.1. Maximum: 1.

Maintenance factor

Enter this project assumption in a unitless value. The current imperial default is 0.8. Minimum: 0.1. Maximum: 1.

Lumens per fixture

Enter this project assumption in lm. The current imperial default is 5000 lm.

Watts per fixture

Enter this project assumption in W. The current imperial default is 45 W.

Lighting hours per day

Enter this project assumption in hours. The current imperial default is 8 hours. Minimum: 0. Maximum: 24.

Operating days per month

Enter this project assumption in days. The current imperial default is 22 days. Minimum: 0. Maximum: 31.

Electricity price

Enter this project assumption in per kWh. The current imperial default is 0.18 per kWh. Minimum: 0.

Price per fixture

Enter this project assumption in a unitless value. The current imperial default is 65. Minimum: 0.

How to read the outputs

Required lumens

factors included. Default preview: 75,000.

Installed illuminance

average estimate. Default preview: 75 fc.

Connected lighting load

45 W per fixture. Default preview: 0.68 kW.

Monthly electricity

entered schedule. Default preview: 118.8 kWh.

Monthly energy cost

entered rate. Default preview: $21.38.

Fixture purchase cost

fixtures only. Default preview: $975.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Required lumens = area × target illuminance ÷ utilization ÷ maintenance. Fixtures are rounded up.

Related tools

Continue planning the project

FAQ

Workshop Lighting Calculator questions

Why use utilization and maintenance factors?+

Not all light reaches the work plane and output declines over time.

Is average light enough for precision work?+

Detailed tasks may need dedicated task lighting.

Does this design fixture spacing?+

No. Use manufacturer photometric data.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

About the author