Cement, sand, lime and batch cost

Mortar Mix Ratio Calculator

Split a planned mortar volume into cement, sand and lime components using adjustable mix parts, dry-volume factor, bag yields and prices.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

29.26 ft³

Cement bags

6

Sand volume

0.79 yd³

Lime bags

3

Cement volume

5.32 ft³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Dry batch volume = finished volume × dry-volume factor × waste factor. Each ingredient volume equals dry batch volume × its parts ÷ total parts.

Related tools

Continue planning the project

FAQ

Mortar Mix Ratio Calculator questions

Why is dry volume larger than finished mortar volume?+

Loose dry ingredients contain void space and compact when mixed, so an adjustable dry-volume factor is included.

Do the parts need to total a specific number?+

No. The calculator normalizes any positive relative parts automatically.

Can one mortar ratio be used everywhere?+

No. Required mortar type and proportions depend on masonry, exposure, loading and specification.