Compacted depth, loose aggregate order and tonnage

Gravel Compaction Calculator

Estimate loose gravel volume, order tonnage, delivery loads and cost required to achieve a compacted aggregate layer.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

14.8 US tons

Finished compacted volume

8.9 yd³

Loose order volume

10.6 yd³

Delivery loads

1

Material allowance

$623.64

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Project length

Enter this project assumption in ft. The current imperial default is 60 ft.

Project width

Enter this project assumption in ft. The current imperial default is 12 ft.

Finished compacted depth

Enter this project assumption in in. The current imperial default is 4 in.

Volume reduction during compaction

Enter this project assumption in %. The current imperial default is 12 %. Minimum: 0. Maximum: 50.

Grading allowance

Enter this project assumption in %. The current imperial default is 5 %. Minimum: 0. Maximum: 50.

Loose aggregate density

Enter this project assumption in US tons/yd³. The current imperial default is 1.4 US tons/yd³.

Usable delivery weight

Enter this project assumption in US tons. The current imperial default is 18 US tons.

Price per weight unit

Enter this project assumption in per US ton. The current imperial default is 42 per US ton. Minimum: 0.

How to read the outputs

Finished compacted volume

target aggregate layer. Default preview: 8.9 yd³.

Loose order volume

compaction and grading included. Default preview: 10.6 yd³.

Delivery loads

18 US tons usable each. Default preview: 1.

Material allowance

order weight × entered price. Default preview: $623.64.

Compaction reduction

editable aggregate assumption. Default preview: 12%.

Grading allowance

trimming and handling. Default preview: 5%.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Finished volume = area × compacted depth. Loose volume = finished volume ÷ (1 − compaction reduction). Add grading allowance, then multiply by loose density for order weight.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Gravel Compaction Calculator questions

Why order more loose gravel than the finished volume?+

Vibration and rolling reduce voids, so the material occupies less volume after compaction.

Should every gravel type use the same density?+

No. Crushed stone, clean gravel and dense-graded base have different bulk densities and void content.

Does the result include subgrade settlement?+

No. Repair soft subgrade and account for geotextile or stabilization separately.