Bank volume, swell, hauling, disposal and equipment budget

Excavation Cost Calculator

Estimate excavation cost from dimensions, soil swell, excavation rate, truck capacity, haul cost, disposal rate and mobilization.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

$5,895.00

Bank volume

80 yd³

Loose volume

100 yd³

Truckloads

9

Excavation work

$1,120.00

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Excavation length

Enter this project assumption in ft. The current imperial default is 40 ft.

Excavation width

Enter this project assumption in ft. The current imperial default is 18 ft.

Average excavation depth

Enter this project assumption in ft. The current imperial default is 3 ft.

Loose-soil swell

Enter this project assumption in %. The current imperial default is 25 %. Minimum: 0. Maximum: 80.

Excavation rate

Enter this project assumption in per yd³ bank. The current imperial default is 14 per yd³ bank. Minimum: 0.

Truck capacity

Enter this project assumption in yd³ loose. The current imperial default is 12 yd³ loose.

Haul cost per truckload

Enter this project assumption in per load. The current imperial default is 225 per load. Minimum: 0.

Disposal or import rate

Enter this project assumption in per yd³ loose. The current imperial default is 18 per yd³ loose. Minimum: 0.

Mobilization and equipment allowance

Enter this project assumption in fixed. The current imperial default is 950 fixed. Minimum: 0.

How to read the outputs

Bank volume

in-place excavation. Default preview: 80 yd³.

Loose volume

25% swell. Default preview: 100 yd³.

Truckloads

12 yd³ capacity. Default preview: 9.

Excavation work

bank volume × rate. Default preview: $1,120.00.

Hauling and disposal

loose volume and rounded loads. Default preview: $3,825.00.

Cost per bank volume

per yd³. Default preview: $73.69.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Bank volume = length × width × depth. Loose volume = bank volume × swell factor. Loads are rounded up. Total cost adds excavation, hauling, disposal and mobilization.

Related tools

Continue planning the project

FAQ

Excavation Cost Calculator questions

What is soil swell?+

Excavated soil occupies more volume after it is loosened. The percentage varies by material and handling.

Why round truckloads up?+

A partial final load still requires a truck trip and may be billed as a full load.

Does this include backfill?+

No. Imported fill, compaction and final grading should be estimated separately when required.