Ordered volume, measured placement and shortage or overage

Concrete Yield Calculator

Compare ordered concrete with the measured placed volume to estimate yield percentage, shortage, overage and average coverage.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

0.47 yd³

Measured slab volume

11.67 yd³

Total measured use

12.47 yd³

Yield percentage

103.9%

Coverage per ordered volume

70 ft²/yd³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Concrete ordered

Enter this project assumption in yd³. The current imperial default is 12 yd³.

Measured placement length

Enter this project assumption in ft. The current imperial default is 42 ft.

Measured placement width

Enter this project assumption in ft. The current imperial default is 20 ft.

Average placed depth

Enter this project assumption in in. The current imperial default is 4.5 in.

Other beams, thickened edges or waste

Enter this project assumption in yd³. The current imperial default is 0.8 yd³. Minimum: 0.

Desired reserve after placement

Enter this project assumption in %. The current imperial default is 5 %. Minimum: 0. Maximum: 25.

How to read the outputs

Measured slab volume

length × width × average depth. Default preview: 11.67 yd³.

Total measured use

includes entered additional volume. Default preview: 12.47 yd³.

Yield percentage

measured use ÷ ordered volume. Default preview: 103.9%.

Coverage per ordered volume

at the entered average depth. Default preview: 70 ft²/yd³.

Target reserve

5% of measured use. Default preview: 0.62 yd³.

Order for target reserve

measured use plus reserve. Default preview: 13.09 yd³.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Measured use = slab length × width × average depth + other entered volume. Yield percentage = measured use ÷ ordered volume × 100. Balance = ordered volume − measured use.

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Concrete Yield Calculator questions

Why can measured yield differ from the delivery ticket?+

Average thickness, subgrade depressions, form dimensions, spillage and measurement uncertainty can change the field estimate.

What should be entered as other volume?+

Include thickened edges, grade beams, pump priming, test samples or other concrete that is not represented by the main slab dimensions.

Does a yield above 100% always mean a supplier shortage?+

No. It first indicates that the measured use exceeds the order. Verify dimensions, average depth and all placement assumptions before drawing a conclusion.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

About the author