Cylindrical piers, optional bells, bags and cost

Concrete Pier Calculator

Estimate concrete for cylindrical piers with optional widened bases, including volume, full bags, placed weight and ready-mix cost.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

1.37 yd³

Concrete bags

62

Shaft volume

1.24 yd³

Bell-base extra

0 ft³

Total drilled depth

24 ft

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Pier diameter

Enter this project assumption in in. The current imperial default is 16 in.

Pier depth

Enter this project assumption in ft. The current imperial default is 4 ft.

Number of piers

Enter this project assumption in a unitless value. The current imperial default is 6. Minimum: 1.

Base-bell diameter

Enter this project assumption in in. The current imperial default is 16 in.

Base-bell thickness

Enter this project assumption in in. The current imperial default is 0 in. Minimum: 0.

Extra allowance

Enter this project assumption in %. The current imperial default is 10 %. Minimum: 0. Maximum: 50.

Concrete yield per bag

Enter this project assumption in ft³. The current imperial default is 0.6 ft³.

Ready-mix price

Enter this project assumption in per yd³. The current imperial default is 165 per yd³. Minimum: 0.

Price per bag

Enter this project assumption in a unitless value. The current imperial default is 7. Minimum: 0.

How to read the outputs

Concrete bags

rounded full bags. Default preview: 62.

Shaft volume

cylindrical shafts. Default preview: 1.24 yd³.

Bell-base extra

beyond shaft diameter. Default preview: 0 ft³.

Total drilled depth

all piers. Default preview: 24 ft.

Placed weight

planning density. Default preview: 5,523 lb.

Cost comparison

ready-mix / bags. Default preview: $225.26 / $434.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Shaft volume = π × radius² × depth × quantity. Optional bell volume adds only the widened area beyond the shaft. Allowance is applied before bag rounding.

Reviewed project guidance

How to use this estimate in a real project

Last reviewed: July 30, 2026

Estimate concrete for cylindrical piers from diameter, depth, quantity and waste allowance.

Calculation steps

  1. 1Enter the actual project dimensions or operating values.
  2. 2Apply the calculator formula using consistent units.
  3. 3Review the unrounded result and the editable allowance.
  4. 4Round only to the product, stock length or equipment increment actually purchased.

Worked numerical example

Six piers 12 in diameter and 4 ft deep require about 0.70 yd³ before waste.

Purchasing and rounding

Multiply one cylindrical pier volume by the actual pier count, then add only a documented placement allowance. For bagged concrete, convert the final volume using the bag's published yield and round up to whole bags; for ready-mix, use the supplier's delivery increment.

Interpret the result

The result is concrete volume for cylindrical shafts of the entered diameter and depth. Bell bottoms, enlarged footings, over-excavation and irregular augered holes are extra volume and should be measured or allowed for separately rather than hidden in the pier diameter.

Page-specific assumptions

  • Inputs describe one consistent project condition.
  • Entered yields and efficiencies match the selected product or equipment.
  • Site-specific code and engineering requirements are checked separately.

Common mistakes

  • Mixing imperial and metric inputs.
  • Using nominal dimensions where actual coverage controls.
  • Rounding intermediate values too early.
  • Treating a quantity estimate as design approval.

Primary and technical references

BuildMeter provides planning estimates, not engineering, architectural, electrical, mechanical, plumbing, permit or code approval. Review the methodology and verify final decisions with product documentation and qualified professionals.

Related tools

Continue planning the project

FAQ

Concrete Pier Calculator questions

Is a concrete pier the same as a post hole?+

The geometry can be similar, but structural piers may carry significant loads and require engineered diameter, depth, reinforcement and bearing.

How is an optional bell base counted?+

Only the widened portion beyond the shaft diameter is added, avoiding double-counting the shaft through the bell thickness.

Does this account for soil falling into the hole?+

The allowance can cover modest irregularity, but unstable excavations may need casing, forms or a larger contingency.