Post holes, bags and concrete volume

Post-Hole Concrete Calculator

Estimate concrete volume, bag quantity, excavation volume and material cost for round fence, deck or sign-post holes.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

47 bags

Concrete volume

1.02 yd³

Concrete per hole

2.3 ft³

Excavated volume

1.05 yd³

Total drilled depth

36 ft

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Concrete per hole = cylindrical hole volume − post displacement. Total order = concrete per hole × hole count × allowance.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Post-Hole Concrete Calculator questions

Should the post volume be subtracted?+

Yes for a closer estimate. The calculator subtracts a circular displacement based on the entered post width.

How deep should a post hole be?+

Depth depends on post height, wind, soil, frost line and local requirements.

Can dry concrete be poured directly into the hole?+

Follow the exact product instructions and project requirements; installation methods vary.