Footing volume, displacement, bags and cost

Concrete Bollard Footing Calculator

Estimate concrete volume, bags, drilled depth, post displacement, placed weight and cost for cylindrical bollard footings.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

1.15 yd³

Concrete bags

52

Net base volume

1.05 yd³

Gross hole volume

1.18 yd³

Bollard displacement

3.53 ft³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Footing-hole diameter

Enter this project assumption in in. The current imperial default is 18 in.

Footing depth

Enter this project assumption in ft. The current imperial default is 3 ft.

Embedded bollard diameter

Enter this project assumption in in. The current imperial default is 6 in.

Embedded bollard depth

Enter this project assumption in ft. The current imperial default is 3 ft.

Bollard footings

Enter this project assumption in a unitless value. The current imperial default is 6. Minimum: 1.

Extra allowance

Enter this project assumption in %. The current imperial default is 10 %. Minimum: 0. Maximum: 50.

Concrete yield per bag

Enter this project assumption in ft³. The current imperial default is 0.6 ft³.

Ready-mix price

Enter this project assumption in per yd³. The current imperial default is 165 per yd³. Minimum: 0.

Price per bag

Enter this project assumption in a unitless value. The current imperial default is 7. Minimum: 0.

How to read the outputs

Concrete bags

rounded full bags. Default preview: 52.

Net base volume

post displacement deducted. Default preview: 1.05 yd³.

Gross hole volume

before displacement. Default preview: 1.18 yd³.

Bollard displacement

embedded cylinder volume. Default preview: 3.53 ft³.

Total drilled depth

all footings. Default preview: 18 ft.

Placed weight

planning density. Default preview: 4,660 lb.

Cost comparison

ready-mix / bags. Default preview: $190.07 / $364.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Net concrete = cylindrical hole volume − embedded post volume. Quantity and allowance are applied before ready-mix conversion and bag rounding.

Reviewed project guidance

How to use this estimate in a real project

Last reviewed: July 30, 2026

Estimate concrete volume for cylindrical or rectangular bollard footings from diameter, depth and quantity. Footing dimensions, reinforcement and vehicle-impact performance must come from the approved design.

Calculation steps

  1. 1Confirm the designed footing shape and dimensions.
  2. 2Calculate one footing volume using the correct geometry.
  3. 3Multiply by bollard quantity and add any collars or slabs separately.
  4. 4Apply placement allowance and round to supplier or batch increments.

Worked numerical example

Eight circular footings 18 in in diameter and 4 ft deep contain about 56.5 ft³, or 2.09 yd³. With 10% allowance, plan about 2.30 yd³.

Purchasing and rounding

Coordinate excavation, sleeves, bollards, reinforcement and concrete placement before ordering. Small isolated holes may have substantial over-excavation and spillage allowance.

Interpret the result

The result is concrete volume only. It does not establish impact rating, embedment, reinforcement, spacing or foundation adequacy.

Page-specific assumptions

  • Footing dimensions come from approved details.
  • Excavations are reasonably close to design size.
  • Bollard displacement is not deducted unless significant.

Common mistakes

  • Sizing the footing from bollard diameter alone.
  • Ignoring enlarged or collapsed excavations.
  • Confusing bollard embedment with footing depth.
  • Treating material quantity as impact design.

Primary and technical references

BuildMeter provides planning estimates, not engineering, architectural, electrical, mechanical, plumbing, permit or code approval. Review the methodology and verify final decisions with product documentation and qualified professionals.

Related tools

Continue planning the project

FAQ

Concrete Bollard Footing Calculator questions

Why subtract bollard displacement?+

The embedded post occupies space that would otherwise be filled with concrete.

Does this determine the required footing size?+

No. Soil, loading, reinforcement and embedment require project-specific design.

Can I estimate sleeved bollards?+

Use the outside diameter of the embedded sleeve or assembly.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

Individual editorial review completed: July 30, 2026