Gravel base, side backfill, bags, bulk volume and cost

Catch Basin Gravel Calculator

Estimate compacted gravel for catch-basin bases and side backfill using excavation dimensions, basin dimensions, base depth, quantity, compaction allowance and bag size.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

63 bags

Net gravel volume

1.01 yd³

Base gravel each

0.077 yd³

Side backfill each

0.26 yd³

Purchased bag volume

1.17 yd³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Excavation length

Enter this project assumption in ft. The current imperial default is 2.5 ft.

Excavation width

Enter this project assumption in ft. The current imperial default is 2.5 ft.

Catch-basin outside length

Enter this project assumption in ft. The current imperial default is 1.25 ft.

Catch-basin outside width

Enter this project assumption in ft. The current imperial default is 1.25 ft.

Gravel side-backfill height

Enter this project assumption in ft. The current imperial default is 1.5 ft.

Gravel base depth

Enter this project assumption in in. The current imperial default is 4 in.

Number of equal basins

Enter this project assumption in a unitless value. The current imperial default is 3. Minimum: 1.

Compaction and handling allowance

Enter this project assumption in %. The current imperial default is 15 %. Minimum: 0. Maximum: 50.

Gravel volume per bag

Enter this project assumption in ft³. The current imperial default is 0.5 ft³.

Price per bag

Enter this project assumption in a unitless value. The current imperial default is 7. Minimum: 0.

How to read the outputs

Net gravel volume

3 equal basins. Default preview: 1.01 yd³.

Base gravel each

full excavation footprint. Default preview: 0.077 yd³.

Side backfill each

excavation minus basin footprint. Default preview: 0.26 yd³.

Purchased bag volume

full bags. Default preview: 1.17 yd³.

Base depth

editable installation assumption. Default preview: 4 in.

Bagged gravel cost

full bags only. Default preview: $441.00.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Gravel volume = full excavation base volume + side-backfill volume outside the basin. Multiply by basin count, add compaction allowance and round to full bags.

Related tools

Continue planning the project

BuildMeter Guides

Understand the measurements and assumptions

Use these visible reference guides before changing project inputs or planning allowances.

FAQ

Catch Basin Gravel Calculator questions

Why subtract the basin footprint from side backfill?+

The basin occupies the center of the excavation, so only the surrounding annular space receives side gravel.

Is gravel always used around the full basin height?+

No. Backfill material and height depend on the product, surface loading and installation detail.

Does this size the catch basin or outlet pipe?+

No. Runoff, grate capacity, debris and pipe hydraulics determine basin and outlet sizing.