Trapezoidal earth volume, compacted fill, truckloads and cost

Berm Volume Calculator

Estimate soil for straight trapezoidal berms using length, top width, base width, height, berm quantity, compaction allowance, density and truck capacity.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

100 yd³

Compacted berm volume

83.33 yd³

Cross-section area

22.5 ft²

Estimated loose weight

120 US tons

Full-truck capacity

108 yd³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Advertisement

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Cross-section area = (top width + base width) ÷ 2 × height. Multiply by length and berm count, then add the entered compaction and grading allowance.

Related tools

Continue planning the project

FAQ

Berm Volume Calculator questions

Why is the berm modeled as a trapezoid?+

A trapezoid represents a flat or rounded working top with sloped sides using simple measurable widths. Irregular profiles should be split into sections.

What does the compaction allowance represent?+

Loose delivered soil occupies more volume than compacted placed soil and grading creates handling loss. Use a project-specific allowance based on the material.

Does the calculator choose a safe side slope?+

No. Soil type, saturation, height, erosion and site constraints determine slope stability and may require professional evaluation.