Charge duration, grid energy and cost

Battery Charge Time Calculator

Estimate battery charging time, stored energy, grid energy, average input power and cost from capacity, state of charge and charger performance.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

2.69 hours

Energy added to battery

7 kWh

Grid energy consumed

8.08 kWh

Conversion and auxiliary loss

1.08 kWh

Effective stored rate

2.6 kW

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Battery usable capacity

Enter this project assumption in kWh. The current imperial default is 10 kWh.

Starting state of charge

Enter this project assumption in %. The current imperial default is 20 %. Minimum: 0. Maximum: 99.

Target state of charge

Enter this project assumption in %. The current imperial default is 90 %. Minimum: 1. Maximum: 100.

Charger input power

Enter this project assumption in kW. The current imperial default is 3 kW.

Charging efficiency

Enter this project assumption in %. The current imperial default is 90 %. Minimum: 1. Maximum: 100.

Auxiliary battery-system load

Enter this project assumption in kW. The current imperial default is 0.1 kW. Minimum: 0.

Electricity price

Enter this project assumption in per kWh. The current imperial default is 0.18 per kWh. Minimum: 0.

How to read the outputs

Energy added to battery

usable stored energy. Default preview: 7 kWh.

Grid energy consumed

charger input × time. Default preview: 8.08 kWh.

Conversion and auxiliary loss

grid energy minus stored. Default preview: 1.08 kWh.

Effective stored rate

after efficiency and auxiliary load. Default preview: 2.6 kW.

Charging cost

entered electricity rate. Default preview: $1.45.

SOC increase

target minus start. Default preview: 70 percentage points.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Stored energy needed = battery capacity × SOC increase. Effective stored power = charger input × efficiency − auxiliary load. Time = stored energy ÷ effective stored power.

Related tools

Continue planning the project

FAQ

Battery Charge Time Calculator questions

Why can charging slow near full capacity?+

Battery management systems often reduce power near high state of charge to protect cells.

Is usable capacity the same as nameplate capacity?+

Not always. Some systems reserve capacity at the top or bottom, so use the usable value available to the owner.

Does the estimate include standby loads?+

Yes, through the editable auxiliary-load input during charging.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

About the author