Compare inflow, usable pit volume, pump capacity and cycling behavior. Includes measurement workflow, a worked example, decision table, ordering checkpoints, common failures and professional boundaries.
Direct answer
What to know first
Compare inflow, usable pit volume, pump capacity and cycling behavior.
Open Sump Pump Runtime CalculatorDefine the project boundary first
Compare inflow, usable pit volume, pump capacity and cycling behavior. Record the design condition, measured scope, operating schedule and product assumptions before comparing quantities or costs. Keep code-controlled values separate from editable planning assumptions.
Worked example
If a sump receives 12 gal/min during a storm and the pump delivers 30 gal/min at the actual discharge head, net drawdown while running is about 18 gal/min. With 9 gallons of usable pit volume between on/off levels, one pumping cycle would take roughly 30 seconds after startup, before considering inflow variation.
Planning decision table
| Checkpoint | Verify | Record |
|---|---|---|
| Demand | Field measurements and design condition | Unrounded requirement |
| Performance | Rated capacity at actual conditions | Efficiency or usable yield |
| Distribution | Route, support, controls and losses | Adjustment factors |
| Purchase/operation | Package size, equipment count or runtime | Rounded final quantity |
Measurement and calculation workflow
- Sketch the connected system and divide it into independently measurable sections.
- Use one unit system and label every design-controlled input.
- Calculate the raw demand before efficiency, diversity, allowance or tariff adjustments.
- Apply each adjustment once and document why it is appropriate.
- Round only the final purchasing or equipment-count result and reconcile the surplus.
Ordering and coordination
Use the pump curve at actual static head plus pipe/fitting losses, not the zero-head nameplate flow. Confirm usable pit volume, switch levels, check valve, discharge route, backup power and alarm strategy.
Common project failures
- Using nominal ratings without checking the actual design condition.
- Mixing peak demand with daily or annual energy.
- Hiding multiple allowances inside one input.
- Ignoring distribution losses, cycling or control strategy.
- Ordering before field dimensions and connection requirements are verified.
How to interpret calculator results
Compare inflow with delivered pump capacity and expected cycling. Excessively short cycles can indicate too little usable pit volume even when peak flow capacity appears adequate.
Technical references and limits
This guide supports sump-pump capacity and runtime planning. Flood risk, electrical safety, discharge legality, backup systems and final pump selection require site-specific review.