Total volume, mix components and bulk cost

Garden Soil Mix Calculator

Calculate garden-bed soil volume and split the order into topsoil, compost and aeration components using adjustable mix shares.

Imperial and metric Rounded purchase quantities Cost estimate

Default project preview

1.96 yd³

Topsoil

0.98 yd³

Compost

0.59 yd³

Aeration material

0.39 yd³

Base volume

1.78 yd³

Calculator

Build the material order

Your order will appear here

Enter the project details and calculate a rounded material estimate.

Input and output guide

What each value means

The labels and units below are part of this calculator’s visible methodology. Replace every default with measurements or product data from the actual project.

Bed length

Enter this project assumption in ft. The current imperial default is 12 ft.

Bed width

Enter this project assumption in ft. The current imperial default is 4 ft.

Mix depth

Enter this project assumption in in. The current imperial default is 12 in.

Settlement allowance

Enter this project assumption in %. The current imperial default is 10 %. Minimum: 0. Maximum: 50.

Topsoil share

Enter this project assumption in parts. The current imperial default is 50 parts. Minimum: 0.

Compost share

Enter this project assumption in parts. The current imperial default is 30 parts. Minimum: 0.

Aeration share

Enter this project assumption in parts. The current imperial default is 20 parts. Minimum: 0.

Topsoil bulk price

Enter this project assumption in per yd³. The current imperial default is 40 per yd³. Minimum: 0.

Compost bulk price

Enter this project assumption in per yd³. The current imperial default is 65 per yd³. Minimum: 0.

Aeration bulk price

Enter this project assumption in per yd³. The current imperial default is 80 per yd³. Minimum: 0.

How to read the outputs

Topsoil

50% of mix. Default preview: 0.98 yd³.

Compost

30% of mix. Default preview: 0.59 yd³.

Aeration material

20% of mix. Default preview: 0.39 yd³.

Base volume

before allowance. Default preview: 1.78 yd³.

Bed area

rectangular footprint. Default preview: 48 ft².

Bulk mix cost

component prices combined. Default preview: $108.53.

Methodology

Transparent calculation

BuildMeter converts every input to a consistent internal unit, applies the selected allowance, and rounds products up to whole purchasable units.

Bed volume = length × width × depth × settlement factor. Each component volume equals total order volume × its share ÷ the sum of all entered shares.

Reviewed project guidance

How to use this estimate in a real project

Last reviewed: July 30, 2026

Use this calculator to divide a target soil volume among topsoil, compost and drainage or aeration components using editable mix percentages. It supports purchasing and does not prescribe a universal planting mix.

Calculation steps

  1. 1Calculate the total filled volume.
  2. 2Confirm component percentages total 100%.
  3. 3Multiply total volume by each component fraction.
  4. 4Convert each component to supplier units and round separately.

Worked numerical example

A raised area requiring 3 yd³ with a 60/30/10 mix needs 1.8 yd³ topsoil, 0.9 yd³ compost and 0.3 yd³ aeration material before package rounding.

Purchasing and rounding

Bulk materials are rounded to delivery increments; bagged products are rounded to whole bags. Different components may use different sold units.

Interpret the result

The largest component controls most of the delivery volume, while small percentages can still require a full bag or bulk increment.

Page-specific assumptions

  • Percentages are volume-based.
  • Materials are measured loose.
  • Settling allowance is included if needed.
  • The selected mix is suitable for the plants and drainage.

Common mistakes

  • Using weight percentages with volume quantities.
  • Allowing percentages not to total 100%.
  • Ignoring settling.
  • Assuming one mix suits every planting.

Primary and technical references

BuildMeter provides planning estimates, not engineering, architectural, electrical, mechanical, plumbing, permit or code approval. Review the methodology and verify final decisions with product documentation and qualified professionals.

Related tools

Continue planning the project

FAQ

Garden Soil Mix Calculator questions

Do the mix shares need to total 100?+

No. The calculator treats them as relative parts and normalizes them automatically.

Why add a settlement allowance?+

Loose soil and compost settle after filling and watering, so an allowance can help maintain the planned finished depth.

Is one mix suitable for every plant?+

No. Drainage, nutrient needs, native soil and crop type should guide the final recipe.

Built and reviewed by Liron Elimeleh

Liron Elimeleh, software engineer and founder of BuildMeter, develops the calculation logic, unit conversions, validation and visible assumptions. ELStudios maintains the source and public correction history.

Individual editorial review completed: July 30, 2026

About the author